Friday, March 31, 2006

00147 Lower sail with spar

Finished most of the big sewing jobs, now to knuckle down to the details like the keel and the reinforcements for the spar pockets. The lower sail is all hemmed up (as shown here) with a spar pocket immaculately sewn in (I am the bomb). The upper sail is all hemmed up and waiting for Dacron reinforcements. Miscalculated the lengths of bridal line needed, but I'm going to Dan(Harradine)'s house tomorrow and he's offering up dyneema lines, which I should be able to sheathe and use instead. Result.

No comments:

Post a Comment